You don't have javascript enabled. Good luck with that.
Pencarian
Kali Grogol Butuh Normalisasi

Grogol River Needs Normalization

The demolition towards buildings stood atop the connecting channel of Pluis Kemandoran Village, Grogol Utara, Kebayoran Lama, South Jakarta and water channel dredging is still ongoing until now.

We want the river to be normalized. Because it would be the same if the front and the back of the river is repaired, and water will remain enter into those three RWs

Grogol Utara Urban Village Head, Jumadi disclosed, currently, the demolition and dredging process has been done in RW 05, 06 and 14. His side asks Jakarta Water Management Dept to normalize the Grogol Ruver thus water does not turn into its territory.

"We want the river to be normalized. Because it would be the same if the front and the back of the river is repaired, and water will remain enter into those three RWs," he expressed, Saturday (10/7).

Ciliwung River Normalization is Targeted to Finish 2018

According to him, if the river does not overflow, the dredging process will be optimal. It can recede puddle at least 15 minutes.

"If the river is not normalized, our region will not safe from puddle," he disclosed.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye931 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye819 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye648 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye511 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye501 personAldi Geri Lumban Tobing