You don't have javascript enabled. Good luck with that.
Pencarian
Kali Grogol Butuh Normalisasi

Grogol River Needs Normalization

The demolition towards buildings stood atop the connecting channel of Pluis Kemandoran Village, Grogol Utara, Kebayoran Lama, South Jakarta and water channel dredging is still ongoing until now.

We want the river to be normalized. Because it would be the same if the front and the back of the river is repaired, and water will remain enter into those three RWs

Grogol Utara Urban Village Head, Jumadi disclosed, currently, the demolition and dredging process has been done in RW 05, 06 and 14. His side asks Jakarta Water Management Dept to normalize the Grogol Ruver thus water does not turn into its territory.

"We want the river to be normalized. Because it would be the same if the front and the back of the river is repaired, and water will remain enter into those three RWs," he expressed, Saturday (10/7).

Ciliwung River Normalization is Targeted to Finish 2018

According to him, if the river does not overflow, the dredging process will be optimal. It can recede puddle at least 15 minutes.

"If the river is not normalized, our region will not safe from puddle," he disclosed.

Linked News
Popular News indeks
  1. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye580 personAldi Geri Lumban Tobing
  2. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye544 personFakhrizal Fakhri
  3. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye536 personDessy Suciati
  4. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye516 personAldi Geri Lumban Tobing
  5. Thousand Islands Conducts Vehicle Emission Tests on Three Islands

    access_time07-08-2026 remove_red_eye512 personAnita Karyati