You don't have javascript enabled. Good luck with that.
Pencarian
Kali Grogol Butuh Normalisasi
.
photo Ilustrasi - Beritajakarta.id

Grogol River Needs Normalization

The demolition towards buildings stood atop the connecting channel of Pluis Kemandoran Village, Grogol Utara, Kebayoran Lama, South Jakarta and water channel dredging is still ongoing until now.

We want the river to be normalized. Because it would be the same if the front and the back of the river is repaired, and water will remain enter into those three RWs

Grogol Utara Urban Village Head, Jumadi disclosed, currently, the demolition and dredging process has been done in RW 05, 06 and 14. His side asks Jakarta Water Management Dept to normalize the Grogol Ruver thus water does not turn into its territory.

"We want the river to be normalized. Because it would be the same if the front and the back of the river is repaired, and water will remain enter into those three RWs," he expressed, Saturday (10/7).

Ciliwung River Normalization is Targeted to Finish 2018

According to him, if the river does not overflow, the dredging process will be optimal. It can recede puddle at least 15 minutes.

"If the river is not normalized, our region will not safe from puddle," he disclosed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1041 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye907 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye551 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye382 personAldi Geri Lumban Tobing